The National Waterways Development Programme has placed 15 river stretches across Maharashtra on the national waterways map since 2016, yet most remain non-operational despite substantial investment commitments.
Among these designated routes, three waterways traverse eastern Vidarbha through the Godavari river system, a region where agricultural distress and limited transport connectivity have long constrained economic development.
The Wainganga, Wardha, Penganga and Pranahita rivers, which drain much of eastern Vidarbha before joining the Godavari, now face scrutiny over their potential to support cargo and passenger movement under inland water transport policies designed to reduce logistics costs and environmental impact. Feasibility studies conducted between 2016 and 2024 have revealed significant technical barriers to navigation, including inadequate depth, extensive pollution from coal mining and thermal power operations, and seasonal water flow variations that challenge year-round navigation requirements.
As the Inland Waterways Authority of India advances plans to operationalise 47 new national waterways by 2027, the viability of river-based transport in Vidarbha remains uncertain, raising questions about whether inland water transport policies can meaningfully address the region's connectivity needs or whether road and rail infrastructure will continue to dominate freight movement.
Designated Waterways Face Navigation Barriers
The National Waterways Act of 2016 declared 111 inland waterways across 24 states as national waterways, expanding the network from five existing routes to include 106 new stretches spanning 20,375 kilometres.
In Maharashtra, 15 waterways totalling 3,089 kilometres received national waterway designation, with only six stretches covering 530 kilometres becoming operational by 2024.
National Waterway 4, which includes a 1,202-kilometre stretch of the Godavari River from Nashik to Bhadrachalam, represents the most extensive waterway designation in Maharashtra. This waterway extends through multiple states, including Andhra Pradesh, Telangana, Karnataka, Tamil Nadu and Puducherry, incorporating the Krishna River system and several canal networks along the eastern coast.
National Waterway 78, covering 265 kilometres of the Penganga-Wardha river system from the confluence of the Adan and Penganga rivers near Chimata village to the junction with the Pranahita River near Ranvalli village, traverses Yavatmal, Chandrapur and Washim districts in eastern Vidarbha.
Feasibility surveys conducted in 2016 documented bed profiles, bridge clearances and water depth measurements across the 261.51-kilometre surveyed stretch. The assessment identified no existing inland water transport operations, ferry services or tourism activities along the waterway.
Depth measurements revealed that significant portions of the river failed to meet the minimum navigational requirements, with extensive stretches recording depths below 1.2 metres throughout the survey period.
National Waterway 109, encompassing 166 kilometres of the Wainganga-Pranahita river system in Maharashtra and Telangana, faces similar constraints.
The Wainganga River, originating in the Mahadeo Hills of Madhya Pradesh at 1,048 metres, flows 580 kilometres through Seoni, Balaghat and Bhandara districts before merging with the Wardha River to form the Pranahita.
The combined Pranahita River then flows 113 kilometres along the Maharashtra-Telangana border before joining the Godavari at Kaleshwaram.
Despite the extensive drainage basin covering 51,000 square kilometres, navigation potential remains constrained by seasonal flow variations and infrastructure development focused primarily on irrigation and hydropower rather than navigation.
The Godavari basin represents India's second-largest river system, covering 50 percent of Maharashtra's land area with 20 major dams regulating water flow. The basin receives highly variable monsoon rainfall, with most runoff generated in high-elevation areas while downstream regions near major irrigation dams experience limited natural flow.
This spatial and temporal rainfall variability creates challenges for maintaining consistent navigation depths required for commercial vessel operations.
The Maharashtra Water Resources Department has developed river basin models to address water allocation disputes between upstream and downstream users, but navigation requirements have not featured prominently in water management planning priorities.
Technical Constraints Challenge Navigation Development
Feasibility studies conducted by the Inland Waterways Authority of India have identified multiple technical barriers to developing navigation on Vidarbha's rivers.
The National Transport Policy Committee established minimum criteria for declaring national waterways, including a 45-metre wide channel, a minimum depth of 1.5 metres, and continuous navigable stretches of at least 50 kilometres.
Many of the newly designated waterways, including those in eastern Vidarbha, fail to meet these thresholds without substantial intervention.
Dredging requirements present a primary obstacle. Indian rivers, particularly those in northern and central regions, suffer from high siltation rates that reduce channel depths and create navigation hazards.
The Jal Marg Vikas Project on National Waterway 1 along the Ganga River system aims to maintain the least available depths of three metres in the Haldia-Barh stretch, 2.5 metres in the Barh-Ghazipur stretch, and 2.2 metres in the Ghazipur-Varanasi stretch through continuous dredging operations. These depth requirements enable navigation of vessels carrying 1,500 to 2,000 deadweight tonnes.
However, dredging operations on NW-1 involve removing approximately 10 to 11 million cubic metres of sediment annually, representing just 1.5 percent of the river's annual silt load.
Rivers in eastern Vidarbha present more complex dredging challenges due to their geological characteristics and seasonal flow patterns. The Wainganga basin spans crystalline rocks and basalt formations, creating varied bed compositions that influence sediment transport and channel stability.
The region's extensive forest cover, which exceeds 50 percent in parts of the basin, contributes organic matter and sediment to the river system. Deforestation along riverbanks has increased soil erosion and sedimentation rates, further degrading water quality and channel characteristics.
Environmental clearance requirements add regulatory complexity to waterway development. The National Green Tribunal has raised concerns about environmental impacts from dredging operations, particularly in ecologically sensitive regions. Inland waterway projects require environmental clearance for dredging activities, though inland waterways themselves have not been included in the list of projects requiring prior environmental approval.
The Ministry of Environment, Forest and Climate Change and the National Green Tribunal have deliberated for multiple years on whether major waterway projects require comprehensive environmental clearances, creating uncertainty about project timelines and implementation requirements.
Pollution from industrial and urban sources significantly degrades water quality in Vidarbha's rivers, creating additional challenges for navigation development. Coal mining operations in Chandrapur, Wani and Nagpur coal fields have released contaminated water into the Wardha and Kanhan rivers, with hazardous pollutants including lead, zinc, arsenic and cadmium exceeding permissible limits.
The Central Pollution Control Board identified 351 polluted river stretches across India in 2018, subsequently reducing them to 296 polluted stretches by 2025. Maharashtra continues to have the highest number of polluted river stretches among Indian states, with 54 identified locations where water quality fails to meet prescribed standards for biochemical oxygen demand, dissolved oxygen, total coliform count and total dissolved solids.
Thermal power plants in the region contribute to water pollution through heated water discharge and fly ash contamination. Research conducted by environmental organisations documented heavy metal concentrations in the Kanhan River downstream from the Khaparkheda thermal power station, with samples showing elevated levels of aluminium, magnesium, manganese, mercury, iron, molybdenum, lithium and fluoride.
Groundwater samples from wells in affected villages recorded mercury levels exceeding prescribed standards by 51 times, arsenic by 13 times, and selenium by 10 times.
Untreated municipal waste from Nagpur city enters the Wainganga through tributaries, including the Kanhan, affecting fish populations and aquatic ecosystems.
Agricultural Crisis Shapes Regional Transport Needs
Eastern Vidarbha's transport infrastructure requirements reflect the region's agricultural economy and persistent agrarian distress. Approximately 65 percent of the population depends on agriculture, with 93 percent of farmland relying entirely on seasonal rainfall rather than assured irrigation.
The region's location in the rain shadow of the Western Ghats results in limited and erratic rainfall, with deficits ranging from 11 to 25 percent below normal levels in recent years.
Cotton, soybeans and oranges represent major crops, but productivity remains constrained by inadequate irrigation, early monsoon withdrawal and lack of protective irrigation during critical reproductive phases.
Farmer suicide rates in Vidarbha have drawn national attention, with Maharashtra recording at least one farmer suicide every three hours during the first quarter of 2025. The Amravati division, encompassing parts of Vidarbha, accounted for 1,069 farmer suicides in 2024 out of 2,635 statewide.
Districts including Yavatmal, Akola and Washim recorded the highest suicide rates, reflecting complex interactions between debt, crop failure, inadequate irrigation and rising cultivation costs. Government relief packages have provided financial assistance to families of deceased farmers, but have not addressed underlying structural factors, including dependence on private moneylenders, inadequate institutional credit and poor market access for agricultural produce.
The Kelkar Committee report highlighted regional economic imbalances in Maharashtra, noting that agricultural income growth in Vidarbha was zero or possibly negative during the 2001-2010 period.
The report documented disparities in irrigation utilisation, with western Maharashtra achieving 76.4 percent utilisation of created irrigation potential while Vidarbha reached only 47.4 percent despite having 30 percent of the state's crop area. Water use patterns showed western Maharashtra with 36 percent of crop area using 47 percent of available water, while Vidarbha with 30 percent of crop area used only 28 percent of available water.
Traditional water management systems including malguzari tanks have become defunct due to siltation, reducing protective irrigation availability. Research on traditional water systems in eastern Vidarbha documented numerous village-level tanks and water conservation structures that historically supported agriculture but now require restoration and maintenance.
Watershed management approaches emphasising in-situ conservation measures have demonstrated potential to enhance groundwater recharge by 30 to 40 percent, but implementation remains limited across the region.
Industrial development in eastern Vidarbha has focused primarily on mineral extraction and steel production rather than transport-intensive manufacturing. Gadchiroli district has emerged as a steel production hub following the establishment of a 4.5 million tonne per annum integrated steel plant by Lloyds Metals & Energy Limited. JSW Group has announced plans for a 25 million tonne per annum steel plant requiring 3,500 acres in Wadsa taluka, representing investments exceeding Rs 1 lakh crore if realised.
These projects benefit from proximity to iron ore deposits in Kelzar and coalfields in Chandrapur, but rely on road and rail connections to ports rather than river-based transport.
Road infrastructure development has received priority in recent years, with multiple expressway projects designed to improve connectivity between Vidarbha and coastal ports. The Maharashtra State Road Development Corporation has advanced construction of the Nagpur-Gondia expressway covering 132 kilometres, the Bhandara-Gadchiroli expressway spanning 94.2 kilometres, and the Nagpur-Chandrapur corridor extending 122 kilometres.
These projects, totalling more than Rs 56,000 crore in investment, aim to reduce travel times and logistics costs for agricultural produce and industrial materials. The Nagpur-Mumbai Samruddhi Mahamarg, operational since recent years, has reduced freight costs from Rs 2,600 per tonne to Rs 1,700-1,800 per tonne, demonstrating the economic impact of improved road connectivity.
Port access considerations favour eastern ports over Maharashtra's coastal facilities. The Raipur-Visakhapatnam corridor, 88 percent complete at a cost of Rs 37,000 crore, provides steel producers in Gadchiroli direct access to Visakhapatnam and Kakinada ports.
These eastern ports operate with lower congestion and reduced handling costs compared to western Maharashtra ports, making them attractive for exporters despite longer overland distances. The distance from Nagpur to Visakhapatnam via proposed expressways would be shorter than the distance to Mumbai, with additional advantages from less congested port infrastructure.
Cargo movement through inland waterways offers theoretical cost advantages over road and rail transport.
Studies by the Tennessee Valley Authority and other research organisations calculate average transportation savings of $10.67 per tonne for cargo moved via inland waterways compared to alternative modes, translating to more than $7 billion in annual savings across the United States system.
Indian assessments similarly estimate that inland water transport costs can be 30 percent lower than road transport and 50 percent lower than rail transport for bulk commodities. However, these cost advantages depend on adequate infrastructure, including modern terminals, vessel repair facilities, and continuous navigation channels maintained at specified depths throughout the operating season.
Navigation Potential Remains Limited by Multiple Factors
The economic case for developing inland water transport in eastern Vidarbha faces substantial challenges beyond technical navigation requirements. Cargo volumes sufficient to justify infrastructure investments remain uncertain.
The Inland Waterways Authority of India aims to increase freight movement through inland waterways from 2 percent to 5 percent of total freight by 2030, with a target of 200 million metric tonnes under Maritime India Vision 2030 and 500 million metric tonnes by 2047 under Maritime Amrit Kaal Vision 2047.
Achieving these targets requires identifying consistent cargo flows that can shift from road and rail to water transport.
Vidarbha's agricultural economy generates cargo flows primarily during harvest seasons, creating temporal mismatches with year-round navigation requirements. Cotton, the dominant cash crop, moves from production areas to processing units and textile mills in concentrated post-harvest periods rather than continuous flows suitable for scheduled water transport services. Soybean and orange production follow similar seasonal patterns. Industrial cargo, including coal, fly ash and steel products, currently moves via dedicated rail corridors and road networks that connect directly to mines, power plants and steel facilities without requiring transhipment to water vessels.
Infrastructure requirements for functional inland water transport extend beyond channel dredging to include terminal facilities, vessel fleets, cargo handling equipment and multimodal connections to road and rail networks. The development of National Waterway 1 along the Ganga River has required the construction of 49 community jetties, 20 floating terminals, three multi-modal terminals and one inter-modal terminal in addition to fairway development and navigational aids.
Terminal development at Varanasi, Kalughat, Sahibganj and Haldia aims to create capacity for vessel movements carrying 1,500 to 2,000 deadweight tonnes. Similar infrastructure investments would be necessary to enable commercial operations on Vidarbha's rivers, requiring coordination between multiple state and central agencies responsible for different aspects of waterway development.
Environmental concerns about navigation development include impacts on aquatic ecosystems, sediment transport patterns and riverine habitats. Dredging operations disrupt benthic communities and can damage spawning grounds for fish species. The Wainganga basin supports 38 fish species, including endemic varieties documented during sample surveys.
Alterations to sediment transport through dredging and channel modification affect delta morphology and coastal ecosystems downstream. Research on India's National River Linking Project has projected substantial reductions in sediment transport to major deltas, with the Godavari delta potentially experiencing 71 to 99 percent reduction in annual suspended sediment load due to reservoir trapping and peak streamflow reductions. Navigation development that further modifies river flow patterns could exacerbate these impacts.
Climate change considerations add uncertainty to long-term navigation viability. Rivers in central India are experiencing altered precipitation patterns, with more intense rainfall events separated by longer dry periods.
These changes affect river discharge patterns and the reliability of maintaining minimum navigation depths during low-flow seasons. Research on the Brahmaputra River has documented alarming water level drops that challenge navigation operations despite substantial infrastructure investments. Progressive climate change manifests as seasonal variations in water discharge that create particular vulnerability for inland waterway transport systems dependent on consistent river flows.
Financial sustainability of waterway operations requires sufficient cargo volumes to recover infrastructure investment and operational costs. The Jalvahak scheme, launched in December 2024 with a budget of Rs 95.42 crore, aims to incentivise cargo movement on National Waterways 1, 2 and 16 by reimbursing up to 35 percent of operational costs for cargo owners.
This subsidy approach acknowledges that waterway transport faces cost disadvantages from multimodal handling requirements despite lower vessel operating costs. Private sector participation remains limited without assured cargo commitments and adequate return on investment prospects.
The National Waterways Construction of Jetties Regulations, notified in 2025, allow private companies to invest in terminal infrastructure, but responses have been modest.
Maharashtra's 15 designated national waterways reflect a broader pattern of ambitious waterway expansion without corresponding operational success. Of the 111 national waterways declared in 2016, feasibility studies identified only 26 as viable for cargo or passenger movement, with developmental activities initiated on 20 waterways.
The remaining 85 waterways were found non-viable due to technical constraints, inadequate traffic potential or environmental concerns. This high failure rate in converting designated waterways to operational routes suggests that waterway expansion policies have prioritised geographic coverage over practical navigation potential.
The contrast between waterway policy ambitions and implementation realities raises questions about resource allocation priorities.
The Rs 6,434 crore invested in national waterway development between 2014 and 2024 has achieved limited results in most designated waterways outside the Ganga and Brahmaputra systems.
Road infrastructure investments in Vidarbha alone, totalling more than Rs 56,000 crore for expressway projects, demonstrate substantially larger financial commitments to land-based transport modes.
The demonstrated benefits of improved road connectivity, including reduced freight costs and enhanced market access for agricultural producers, suggest that policy emphasis on expressway development reflects practical transport economics rather than oversight of waterway alternatives.
Region Pursues Connectivity Through Multiple Channels
Eastern Vidarbha's transport infrastructure evolution continues through road and rail expansion rather than waterway development.
The coal and steel industries driving industrial growth in Chandrapur and Gadchiroli districts require reliable year-round freight movement that existing river systems cannot provide without extensive modifications.
Rail corridor improvements, including the Nagpur-Gondia-Jabalpur doubling project spanning 240 kilometres through Gondia, Bhandara, Gadchiroli and Chandrapur districts, aim to support freight movement for iron ore mines and coalfields. These projects connect directly to industrial sites and power plants without requiring transhipment between transport modes.
Agricultural produce movement faces time sensitivity constraints that limit waterway applicability. Perishable products, including oranges, require rapid transport to maintain quality and market value. The Samruddhi Expressway has enabled faster movement of produce from farms to markets, reducing spoilage and improving returns to farmers. Cotton and soybeans, while less perishable, benefit from direct truck transport to processing facilities and export points without the intermediate handling that water transport would require.
Tourism potential on Vidarbha's rivers remains largely undeveloped. The Wainganga River's literary association with Rudyard Kipling's Jungle Book and proximity to Kanha National Park suggest possibilities for river-based tourism, but infrastructure development has not prioritised this sector. National Waterway 52 on the Kali River in Karnataka and National Waterway 90 on the Sharavati River have been identified as feasible for tourism and ferry services, demonstrating that some newly designated waterways may support recreational use even where cargo transport proves unviable.
The distribution of waterway development investments favours regions with established navigation traditions and substantial existing traffic. The Northeast region has received a Rs 5,000 crore development roadmap over five years, reflecting strategic priorities for connecting landlocked states to Bangladesh via the Indo-Bangladesh Protocol route.
The Ganga waterway system continues to receive the largest share of development funding through the World Bank-supported Jal Marg Vikas Project. Maharashtra's operational waterways include coastal routes and backwaters in the Konkan region rather than inland river systems in Vidarbha.
Policy discussions about inland water transport acknowledge significant barriers to implementation. Studies by research institutions have identified inadequate depth, lack of modern terminals, shortage of vessels, institutional fragmentation, regulatory complexity and overlapping jurisdictions as major challenges facing the sector.
The Central Inland Water Transport Corporation and state governments operate with limited coordination, slowing decision-making and policy implementation. Technical challenges, including low clearance under bridges, lack of night navigation facilities and seasonal water availability, compound these institutional weaknesses.
Regional development planning in eastern Vidarbha has emphasised industrial clusters, agro-processing facilities and infrastructure connectivity to established transport corridors rather than river-based alternatives. The 16 clusters identified under the Cluster Development Programme focus on agro and food processing industries, followed by textiles, reflecting the region's agricultural resource base.
Mother Dairy's Rs 500 crore manufacturing facility in Nagpur and similar investments depend on road connectivity to milk collection points and distribution networks rather than waterway access. The Project on Climate Resilient Agriculture implemented across 2,054 villages in Vidarbha aims to improve agricultural productivity and quality through modern farming techniques, but does not incorporate waterway-based transport components.
The trajectory of transport development in eastern Vidarbha suggests that inland waterway policies designed at the national level have limited applicability to the region's specific geographic, economic and infrastructural conditions.
Rivers that serve primarily agricultural drainage and seasonal flood conveyance functions, with water quality degraded by industrial pollution and urban waste, require transformative interventions to become viable navigation channels.
The opportunity costs of such interventions, measured against alternative investments in road, rail and agricultural infrastructure, appear to favour continued development of land-based transport networks that provide more reliable, flexible and economically viable connectivity for the region's agricultural and industrial activities.
References
Behere, P. B., Rao, T. S., & Mulmule, A. N. (2021). Farmers' suicide: Mental health perspective. In International Journal of Social Psychiatry. https://pmc.ncbi.nlm.nih.gov/articles/PMC3291283/
Centre for Sustainable Development, Manthan Adhyayan Kendra, & Asar. (2021). Water quality assessment report: Nagpur thermal power plants. https://www.indiaspend.com/pollution/how-villagers-living-near-coal-power-plants-lost-health-water-security-814019
Central Water Commission. (n.d.). Godavari Water Disputes Tribunal further report. https://cwc.gov.in/sites/default/files/GWDTAward%20Further%20Report.pdf
Dharmadhikary, S. (2017). National inland waterways in India: A strategic status report. Manthan Adhyayan Kendra. https://www.manthan-india.org/wp-content/uploads/pdf/Strategic-Status-Report-on-Inland-Waterways-V5-26-Apr-17-FINAL.pdf
Dongre, A. R., & Deshmukh, P. R. (2012). Farmers' suicides in the Vidarbha region of Maharashtra, India: A qualitative exploration of their causes. Journal of Injury and Violence Research, 4(1). https://pmc.ncbi.nlm.nih.gov/articles/PMC3291283/
Government of India. (2024). Annual report 2024-25. Ministry of Ports, Shipping and Waterways. https://shipmin.gov.in/sites/default/files/Annual%20Report%202024-25%20-%20English.pdf
Government of India, Press Information Bureau. (2025, January 31). Rejuvenation of inland waterways. https://www.pib.gov.in/PressReleasePage.aspx?PRID=2116161
Government of India, Press Information Bureau. (2024, December 12). National waterways in Maharashtra. https://www.pib.gov.in/PressReleseDetailm.aspx?PRID=2084264
Government of India, Press Information Bureau. (2025, May 26). India to operationalise 47 new national waterways by 2027. https://egov.eletsonline.com/2025/05/india-to-operationalise-47-new-national-waterways-by-2027-cargo-volume-set-to-reach-156-mtp/
IIC Technologies Ltd. (2016). Final feasibility report: National Waterway-78, Penganga-Wardha River. Inland Waterways Authority of India. http://iwai.nic.in/sites/default/files/8747428235NW-78%20Penganga-Wardha%20River%20Final%20FSR.pdf
India Water Resources Information System. (n.d.). Godavari basin. https://indiawris.gov.in/downloads/Godavari%20Basin.pdf
India Water Resources Information System. (n.d.). Major river system in India. https://indiawris.gov.in/wiki/doku.php?id=major_river_system_in_india
Inland Waterways Authority of India. (2024). Feasibility study reports. https://iwai.nic.in/fsr-report
Inland Waterways Authority of India. (n.d.). National Waterway-4. https://iwai.nic.in/waterways?field_national_waterways_tid=2526
Maharashtra Water Resources Department. (2017). Godavari basin integrated water resources plan. https://wrd.maharashtra.gov.in/Site/Upload/PDF/Godawari-Khand1.pdf
Ministry of Ports, Shipping and Waterways. (2016). List of national waterways. https://shipmin.gov.in/list-of-waterways
Ministry of Ports, Shipping and Waterways. (n.d.). Inland water transport. https://shipmin.gov.in/division/iwt-1
National Water Development Agency. (n.d.). Wainganga (Gosikhurd) – Nalganga (Purna Tapi) link project detailed project report. https://nwda.gov.in/upload/uploadfiles/files/cc.pdf
SANDRP. (2017, April 13). Wainganga River: Threatened lifeline of Vidarbha's forests. https://sandrp.in/2017/04/14/wainganga-river-threatened-lifeline-of-vidarbhas-forests/
SANDRP. (2017, March 8). Godavari basin in Maharashtra: A profile. https://sandrp.in/2017/03/08/godavari-basin-in-maharashtra-a-profile/
Sonowal, S. (2025, May 26). IWAI inks MoUs worth Rs 3000 crore to boost inland waterways and logistics in Northeast. DD News. https://ddnews.gov.in/en/iwai-inks-mous-worth-%E2%82%B93000-crore-to-boost-inland-waterways-and-logistics-in-northeast/
The News Dirt. (2025, June 24). Are Vidarbha's rivers dying? https://www.thenewsdirt.com/post/are-vidarbha-s-rivers-dying
The News Dirt. (2025, August 21). Vidarbha's manufacturing push under Make in India 2.0. https://www.thenewsdirt.com/post/vidarbha-s-manufacturing-push-under-make-in-india-2-0
The Times of India. (2025, September 28). Expressway boom: 10 of 11 Vidarbha districts to gain high-speed connectivity. https://timesofindia.indiatimes.com/city/nagpur/expressway-boom-10-of-11-vidarbha-districts-to-gain-high-speed-connectivity/articleshow/113765647.cms
U.S. Army Corps of Engineers. (n.d.). Inland waterway navigation value to the nation. https://www.mvp.usace.army.mil/Portals/57/docs/Navigation/InlandWaterways-Value.pdf
World Bank. (2022, November 14). Developing India's first modern inland waterway. https://www.worldbank.org/en/country/india/brief/developing-india-first-modern-inland-waterway